Commercial Toilet Refurbishment – Tilney St. Lawrence, Norfolk

Scope of Works: Refurbishment of Male & Female toilets for local village hall
Design Team: Ben Trundley & Wayne Dewing
Project Management Team: Ben Trundley & Wayne Dewing
Completion Date: November 2023

Overview

Our clients at Tilney St. Lawrence Village Hall approached us with plans to undertake a full refurbishment of the site including external works, internal works, and small groundworks. After some surveyance and budgeting was undertaken, we decided a phased approach was best appropriate for their situation. Opting to begin this process with the refurbishment of their male and female toilets.

Project

The scope from the client was simple – freshen up the space to bring it up to date with the times, make it more eco-friendly, and lower the maintenance burden.

We installed boxing to all of the pipework and beneath the sinks to create a modern and minimilastic finish, alongside installing new toilet cubicles that provided a colour contrast to the white walls. This gives the spaces a 21st century feel. With regards to sustainability, we installed waterless urinals in the men’s toilet to improve water efficiency, and rapid hand dryers in both the men’s and women’s toilet to improve electrical efficiency. Finally, to improve the maintainability of the spaces, we installed whiterock wall cladding which forms a solid surface much less susceptible to damage than painted plasterboard. Especially suitable for a venue that hosts a lot of events for children.

Conclusion

Our clients are very happy with the upgrades that were designed to fit around their desired brief and budget. We look forward to working with them on future phases of this overall redevelopment.